Logo
 
 
8/29/2024
 
 
 
 
 
By:David Larrabee
Dates:9/27/2014 - 9/28/2014
Album Info:I’ve worked on track crews on 3 RRs over the past 5 or 6 years. I’ve leveled track on tangents but never on a curve. Here’s the Walkersville Southern solution to the problem using 120,000 lbs of stone over 2 days work at MP 7.6 aka Curve #10. /DL
  Page Controls   View:  Pics Per Page:
Loading Stone
Title:  Loading Stone
Description:  It took about 4 trips to move the stone the 2 miles to curve 10.
Photo Date:  9/27/2014  Upload Date: 9/29/2014 9:14:10 PM
Location:  Walkersville, MD
Author:  David Larrabee
Categories:  Track
Locomotives:  WSRR 45(45Tonner)
Views:  267   Comments: 0
WSRR 45
Title:  WSRR 45
Description:  A load of stone approaching the survey crew near MP 7.2
Photo Date:  9/27/2014  Upload Date: 9/29/2014 9:14:12 PM
Location:  Walkersville, MD
Author:  David Larrabee
Categories:  Track
Locomotives:  WSRR 45(45Tonner)
Views:  204   Comments: 0
MP7.5
Title:  MP7.5
Description:  The Walkersville Southern operates several miles of the former PRR 'Frederick Secondary' which ran from Columbia, PA to Frederick, Md. Look carefully to the left of the newly painted mile marker and you'll see '61.5' an origional PRR mark with the distance to Columbia. /DL
Photo Date:  9/27/2014  Upload Date: 9/29/2014 9:14:12 PM
Location:  Walkersville, MD
Author:  David Larrabee
Categories:  Track
Locomotives: 
Views:  98   Comments: 0
WSRR 45
Title:  WSRR 45
Description:  'Now just where does this stone go....?" This point is the northern end of the transission spiral into the curve. The out side rail will come up an inch or so to a slightly positive angle. /DL
Photo Date:  9/27/2014  Upload Date: 9/29/2014 9:14:13 PM
Location:  Walkersville, MD
Author:  David Larrabee
Categories:  Track
Locomotives:  WSRR 45(45Tonner)
Views:  214   Comments: 0
WSRR 45 on the stone train
Title:  WSRR 45 on the stone train
Description:  Getting ready to lay the 2nd load.
Photo Date:  9/27/2014  Upload Date: 9/29/2014 9:14:13 PM
Location:  Walkersville, MD
Author:  David Larrabee
Categories:  Track
Locomotives:  WSRR 45(45Tonner)
Views:  242   Comments: 0
WSRR 45
Title:  WSRR 45
Description:  More stone
Photo Date:  9/27/2014  Upload Date: 9/29/2014 9:14:14 PM
Location:  Walkersville, MD
Author:  David Larrabee
Categories:  Track
Locomotives:  WSRR 45(45Tonner)
Views:  166   Comments: 0
Tools of the trade
Title:  Tools of the trade
Description:  7 or 8 track jacks, shovels, lining bars and a sledge.
Photo Date:  9/28/2014  Upload Date: 9/29/2014 9:15:03 PM
Location:  Walkersville, MD
Author:  David Larrabee
Categories:  Track
Locomotives: 
Views:  107   Comments: 0
The 1st lift
Title:  The 1st lift
Description:  Jacks in place, rail up.
Photo Date:  9/28/2014  Upload Date: 9/29/2014 9:15:04 PM
Location:  Walkersville, MD
Author:  David Larrabee
Categories:  Track
Locomotives: 
Views:  90   Comments: 0
Fine Tuning
Title:  Fine Tuning
Description:  (2)/+4 Super elvation is down by -2/16th of an inch and the guage is wide by 4/16th of an inch.
Photo Date:  9/28/2014  Upload Date: 9/29/2014 9:15:04 PM
Location:  Walkersville, MD
Author:  David Larrabee
Categories:  Track
Locomotives: 
Views:  69   Comments: 0
Is it level yet?
Title:  Is it level yet?
Description:  The tamper has passed over the 1st section of track to be raised. If the measurements look okay the tamper will be backed away from the work area and the jacks will be moved to the next section of the curve. /DL
Photo Date:  9/28/2014  Upload Date: 9/29/2014 9:15:05 PM
Location:  Walkersville, MD
Author:  David Larrabee
Categories:  Track
Locomotives: 
Views:  128   Comments: 0
Tamper
Title:  Tamper
Description:  After the 1st pass.
Photo Date:  9/28/2014  Upload Date: 9/29/2014 9:15:06 PM
Location:  Walkersville, MD
Author:  David Larrabee
Categories:  Track
Locomotives: 
Views:  92   Comments: 0
Tamping
Title:  Tamping
Description:  Two or three dips and the tie is firm against the rail. After the entire curve is done a slow order will be placed on this segement of track & after a few trains have passed the track will be checked for level again. Generally with new stone & tamping the track is quite stable and shows very little movement... /DL
Photo Date:  9/28/2014  Upload Date: 9/29/2014 9:15:07 PM
Location:  Walkersville, MD
Author:  David Larrabee
Categories:  Track
Locomotives: 
Views:  83   Comments: 0
Coming out of the curve
Title:  Coming out of the curve
Description:  Late afternoon after 3 lifts the jacks are being layed out for the final lift as the track goes into the next tangent to the south.
Photo Date:  9/28/2014  Upload Date: 9/29/2014 9:15:10 PM
Location:  Walkersville, MD
Author:  David Larrabee
Categories:  Track
Locomotives: 
Views:  109   Comments: 0


Site Design ©2001-2020 Tim Huemmer
Photos © respective authors
  Contact: info@rrpicturearchives.net