Clearing the Freight Yard         
The dump truck is on the main line. The long curve before the 2 mile tanget to Washington Jct begins here. Camera is looking time table east.
Date: 7/25/2009 Location: Ellsworth, ME   Map Show Ellsworth on a rail map Views: 178 Collection Of:   David Larrabee
Author:  David Larrabee
Clearing the Freight Yard
Picture Categories: RollingStock,Yard,Track,Action This picture is part of album:  Working on the Downeast Scenic RR
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1770616